Renewable energy (PV & EV): Oklahoma Unlimited Electrical Journeyman Practice Questions

Solar photovoltaic systems, interconnection, energy storage and electric vehicle charging.
Question 1
In one- and two-family dwellings, what is the maximum PV system dc circuit voltage the NEC permits?
Question 2
Why is a PV string's maximum voltage figured at the lowest expected ambient temperature?
Question 3
The maximum current of a PV source circuit is calculated as the sum of the parallel modules' rated short-circuit currents multiplied by:
Question 4
Before any adjustment or correction, PV circuit conductors must have an ampacity of at least what percentage of the maximum circuit current from 690.8(A)?
Question 5
With PV rapid shutdown initiated, conductors outside the array boundary must be reduced to what level, and how fast?
Question 6
How far from the PV array does the NEC place the array boundary used for rapid shutdown?
Question 7
For a one- or two-family dwelling, where must the PV rapid shutdown initiation device be located?
Question 8
How must the PV system disconnecting means be marked?
Question 9
Where must the PV system disconnecting means be located?
Question 10
What is the maximum number of switches or circuit breakers the NEC allows to make up the PV system disconnecting means?
Question 11
Ground-fault protection is required for dc PV arrays operating above which levels?
Question 12
What does the NEC require for the exposed metal frames of PV modules and their support structures?
Question 13
Which PV system components must be listed or field labeled for the application?
Question 14
A building has a PV system with rapid shutdown. Where must the rapid shutdown label generally be placed?
Question 15
A PV inverter backfeeds a panelboard through a breaker at the end opposite the main. Under the 120% rule, what must not exceed 120% of the busbar rating?

Ready for the real exam?

Get every question, unlimited calculation practice and timed mock exams in the app.
Coming soon
Download on the App Store
Coming soon
Get it on Google Play
Not affiliated with any state agency, TDLR, PSI, NFPA, EPA or CSLB. NEC® and National Electrical Code® are registered trademarks of NFPA.
Practice questions are written in our own words and cite code sections by number. Always study from your own copy of the code and the official candidate bulletin.
PrivacyTerms
© 2026 Trovyn Tech LLC