Mechanical & plumbing systems: NASCLA Commercial General Building Practice Questions

HVAC equipment and tonnage, ductwork, testing and balancing, drainage and venting basics, backflow, fire sprinklers and standpipes, and coordination of MEP work with the structure.
Question 1
One ton of refrigeration (air-conditioning capacity) equals how many Btu per hour?
Question 2
Calculation
A building's cooling load is 540,000 Btu/h. What is the required capacity in tons?
Question 3
In a variable air volume (VAV) system, how is the temperature of each zone controlled?
Question 4
What is testing, adjusting and balancing (TAB) of an HVAC system?
Question 5
Where must fire dampers be installed in ductwork?
Question 6
Why is condensate from cooling coils piped to an approved location?
Question 7
What is the job of a trap under a plumbing fixture?
Question 8
Why does a drainage system need vents?
Question 9
Calculation
A 3-inch building drain runs 80 ft at 1/4 inch per foot. How much total fall does it have?
Question 10
What does a reduced pressure principle (RPZ) backflow preventer protect against?
Question 11
Before concealing new drain, waste and vent piping, what is normally required?
Question 12
What is a wet-pipe sprinkler system?
Question 13
How does a standard fusible or glass-bulb sprinkler head operate in a fire?
Question 14
What is the fire department connection (FDC) on a sprinklered building?
Question 15
Why are pipe sleeves set in concrete slabs and walls before the pour?

Ready for the real exam?

Get every question, unlimited calculation practice and timed mock exams in the app.
Coming soon
Download on the App Store
Coming soon
Get it on Google Play
Not affiliated with any state agency, TDLR, PSI, NFPA, EPA or CSLB. NEC® and National Electrical Code® are registered trademarks of NFPA.
Practice questions are written in our own words and cite code sections by number. Always study from your own copy of the code and the official candidate bulletin.
PrivacyTerms
© 2026 Trovyn Tech LLC