Site construction: NASCLA Commercial General Building Practice Questions

Soils and compaction, earthwork quantities with swell and shrinkage, excavation and trenching safety (OSHA Subpart P), grading and drainage, foundations and piles, surveying, site utilities and erosion control.
Often missed
Question 1
At what depth does OSHA generally require a protective system (sloping, shoring or a shield) in an excavation that is not entirely in stable rock?
Question 2
In a trench 4 feet or more deep, what is the maximum lateral travel distance to a stairway, ladder, ramp or other safe means of egress?
Question 3
How far back from the edge of an excavation must spoil piles, materials and equipment generally be kept?
Question 4
Who inspects excavations and protective systems, and when?
Question 5
Under OSHA's soil classification, Type A soil has an unconfined compressive strength of at least what?
Question 6
Which soil can never be classified as Type A under OSHA, no matter its strength?
Question 7
Under OSHA's sloping tables, what is the maximum allowable slope for an excavation less than 20 ft deep in Type C soil?
Question 8
Calculation
A trench is 8 ft deep in Type B soil and is sloped at 1:1 (given) on both sides. If the bottom is 4 ft wide, how wide is the top?
Question 9
Under Subpart P, a sloping or benching system for an excavation more than 20 feet deep must be designed by whom?
Question 10
Before opening an excavation, what must the employer do about underground utilities?
Question 11
In excavations deeper than 4 feet where a hazardous atmosphere could reasonably be expected, what must be done before workers enter?
Question 12
When a trench shield (trench box) is used, how far below the bottom of the shield may earth be excavated?
Question 13
Under OSHA, what makes an excavation a trench?
Question 14
Calculation
A basement excavation measures 60 ft by 40 ft by 6 ft deep in bank measure. How many bank cubic yards (BCY) is that?
Question 15
Calculation
400 bank cubic yards of clay will be hauled. The clay swells 30% when excavated (given). How many loose cubic yards must the trucks carry?

Ready for the real exam?

Get every question, unlimited calculation practice and timed mock exams in the app.
Coming soon
Download on the App Store
Coming soon
Get it on Google Play
Not affiliated with any state agency, TDLR, PSI, NFPA, EPA or CSLB. NEC® and National Electrical Code® are registered trademarks of NFPA.
Practice questions are written in our own words and cite code sections by number. Always study from your own copy of the code and the official candidate bulletin.
PrivacyTerms
© 2026 Trovyn Tech LLC